Start with four measurements
Measure the playset at its widest, longest, and highest points. Then measure the narrowest gate or side-yard opening on the route to the driveway. Those four numbers reveal whether large sections can leave intact or need to be reduced inside the yard.
Photograph the route, not only the playset
Take one photo from each corner of the structure, then photograph the path to the street. Include gates, steps, retaining walls, pools, low branches, delicate planting beds, and the likely trailer position. A close-up of the post base can also show whether the set is surface-anchored or appears to meet concrete.
Use a simple access checklist
Record the material, approximate age, number of towers, slides, swing bays, visible anchors, and any rotten or leaning sections. Note whether electricity, irrigation, septic components, or buried lines may be near the work zone. Do not probe or cut near utilities.
What the measurements cannot answer
Measurements do not confirm structural stability or the safest dismantling order. Weathered wood can split around bolts, and rusted metal may not separate where expected. The crew should assess those conditions on site before work begins.
Ready to describe the job?
Have the address, measurements, photos, and access notes nearby when you call. The final scope is confirmed after the structure and work area are assessed.
Call (202) 555-0141Sources used for this guide include manufacturer disposal instructions and current local waste-management information. See the private project source log for retrieval dates and limits.